Product Installation

CUB4 Chiller VFD Install

Provide engineering design for lighting two cross walks from the main entrance of the office building to the roadway sidewalk.


A construction site of a new building.

Tigard Medical Oregon Outpatient Surgery Center

  • Replace aging insufficient, undersized, HVAC equipment with new and current technology HVAC.
  • Design new rooftop structural steel framework to support new HVAC rooftop equipment.
  • Design upgrade to current Oregon Healthcare Authority standard of care and Code compliance.

Commercial Building

Tokyo Electron Ltd , Hillsboro OR – NW cleanroom expansion

  • Expansion of existing tech facility for a new cleanroom, core and shell, clean interior fit out, tool ready white space.
  • Certified to class 10 (ISO 4)
  • Mechanical, electrical, process, life safety, utilities to support cleanroom